Information based on query as of Monday, July 8, 2024.
Permit Information
Permit NumberMEC98-02595
StatusFinaled
Name CENYAN LEWIS
Site Address 925 N MILWAUKEE ST
Project NameAMERISUITES HOTEL
Customer Number 
ePlanReview 
Description
hvac/mechanical installation 8/13/98 initial cert. value 115085. dt 1/12/99-final value of 140,839.00 lh
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP - Final1/26/19991/26/19991/26/1999PPASS
DetailsAlan Hauser
01/26/99 350 - final, cathy to sign card
INSP - Final1/26/19991/26/19991/26/1999PPASS
DetailsAlan Hauser
01/26/99 350 - final, cathy to sign card
INSP - Final1/7/19991/8/19991/8/1999APART
DetailsAlan Hauser
01/08/99 350 - flue ok on pool htr.
INSP - Final1/7/19991/8/19991/8/1999APART
DetailsAlan Hauser
01/08/99 350 - flue ok on pool htr.
INSP - Final12/30/199812/31/199812/31/1998APART
DetailsAlan Hauser
12/31/98 350 - temp. hvac, no gas service, called inter. mtn. gas
INSP - Final12/30/199812/31/199812/31/1998APART
DetailsAlan Hauser
12/31/98 350 - temp. hvac, no gas service, called inter. mtn. gas
INSP - Final12/28/199812/28/199812/29/1998PFAIL
DetailsAlan Hauser
12/28/98 350 - walk through, not ready for final
INSP - Final12/28/199812/28/199812/29/1998PFAIL
DetailsAlan Hauser
12/28/98 350 - walk through, not ready for final
INSP - Framing/ Rough-in11/30/199812/1/199812/1/1998ANR
DetailsDave Lightfoot
12/01/98 337 - LARRY SMITH-SEE SONY OR PRESTON ###-####-PAGER -IF CALL W about unit heater inboiler room not ready will get engineer plan
INSP - Framing/ Rough-in10/30/199811/2/199811/2/1998APART
DetailsAlan Hauser
11/02/98 350 - couldn't find anyone from lewis, 4th flr. exhaust ok
INSP - Final10/9/199810/12/199810/12/1998APART
DetailsAlan Hauser
10/12/98 350 - 1st flr. fire damper ok, b-vent ok for cover up to roof should be r/i
INSP - Final10/9/199810/12/199810/12/1998APART
DetailsAlan Hauser
10/12/98 350 - 1st flr. fire damper ok, b-vent ok for cover up to roof should be r/i
INSP - Framing/ Rough-in10/12/199810/12/199810/12/1998 PASS
DetailsAlan Hauser
/ / 350 - partial r/i, looked at flue and s/f dampers
INSP - Framing/ Rough-in9/30/19989/30/19989/30/1998PPASS
DetailsAlan Hauser
09/30/98 350 - 1st floor / larry ###-#### r/i ok for exhaust duct
INSP - Framing/ Rough-in9/16/19989/16/19989/16/1998PPASS
DetailsAlan Hauser
09/16/98 350 - conf. with hvac contractor on job requirements