INSP - Final | 9/16/1998 | 9/16/1998 | 9/16/1998 | P | NR |
Russ Owen
|
|
|
09/16/98 407 - no address posted unable to located called contractor bus
|
INSP - Final | 9/16/1998 | 9/16/1998 | 9/16/1998 | P | NR |
Russ Owen
|
|
|
09/16/98 407 - no address posted unable to located called contractor bus
|
INSP - Framing/ Rough-in | 8/25/1998 | 8/26/1998 | 8/26/1998 | A | PART |
Russ Owen
|
|
|
08/28/98 407 - still has correction.
|
INSP - Framing/ Rough-in | 8/21/1998 | 8/24/1998 | 8/24/1998 | A | NR |
Russ Owen
|
|
|
still has the correction of the 1 inch clearance at flue pipe.
|
INSP - Framing/ Rough-in | 8/21/1998 | 8/21/1998 | 8/21/1998 | P | PASS |
Russ Owen
|
|
|
added this in as i was ther for frame.
|