INSP - Final | 10/22/1998 | 10/23/1998 | 10/23/1998 | P | PASS |
Alan Hauser
|
|
|
10/23/98 350 - signed final card
|
INSP - Final | 10/22/1998 | 10/23/1998 | 10/23/1998 | P | PASS |
Alan Hauser
|
|
|
10/23/98 350 - signed final card
|
INSP - Framing/ Rough-in | 9/21/1998 | 9/21/1998 | 9/21/1998 | P | PASS |
Alan Hauser
|
|
|
09/21/98 350 - part. r/i ok 1st flr.
|
INSP - Framing/ Rough-in | 9/8/1998 | 9/8/1998 | 9/8/1998 | | PART |
Alan Hauser
|
|
|
09/08/98 350 - r/i ok for west wing attic, told contractor to find out a entry way, shown on approved plans
|
INSP - Framing/ Rough-in | 9/4/1998 | 9/8/1998 | 9/8/1998 | A | PART |
Alan Hauser
|
|
|
09/08/98 350 - partial rough-in. west wing only, contractor to check on entry
|
INSP - Framing/ Rough-in | 8/28/1998 | 8/28/1998 | 8/28/1998 | | PASS |
Alan Hauser
|
|
|
08/28/98 350 - conf. to check if hvac has permit, there is permit
|