INSP - Final | 12/7/1998 | 12/7/1998 | 12/7/1998 | | PASS |
|
|
|
no card on site
|
INSP - Final | 12/7/1998 | 12/7/1998 | 12/7/1998 | | PASS |
|
|
|
no card on site
|
INSP - Framing/ Rough-in | 12/3/1998 | 12/3/1998 | 12/4/1998 | P | PART |
Tom Arcoraci
|
|
|
12/03/98 408 - EMILY ###-#### pressure test ok and pipe size correction ok other items not checked
|
INSP - Final | 11/24/1998 | 11/25/1998 | 11/25/1998 | A | FAIL |
Alan Hauser
|
|
|
11/25/98 350 - gasline undersized to wh/tube heater
|
INSP - Final | 11/24/1998 | 11/25/1998 | 11/25/1998 | A | FAIL |
Alan Hauser
|
|
|
11/25/98 350 - gasline undersized to wh/tube heater
|