Final | 2/20/2002 | 2/21/2002 | 2/21/2002 | A | PASS |
Alan Hauser
|
|
|
please call ###-#### bill and let them know that you are on your way. still need final for hydronics and two water heaters by plumber 2/21/2002 10:25:54 AM
|
Rough-in | 9/24/1999 | 9/27/1999 | 9/27/1999 | A | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 09/24/1999 at 16:25:36. Contact: ###-####.CALL 1ST BEFORE INSP R/I ok
|
Rough-in | 9/24/1999 | 9/24/1999 | 9/24/1999 | A | NH |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 09/24/1999 at 05:35:13. Contact: ###-####. Not ready
|
Rough-in | 9/22/1999 | 9/23/1999 | 9/23/1999 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 09/22/1999 at 13:31:32. Contact: ###-####. Prior correction of flex duct connections
|
Conference | 9/21/1999 | 9/21/1999 | 9/21/1999 | A | PART |
Dave Lightfoot
|
|
|
|
INSP - Framing/ Rough-in | 12/14/1998 | 12/14/1998 | 12/15/1998 | P | PASS |
Jim Storey
|
|
|
12/14/98 301 - RGHN-OK ROUGH IN
|
INSP - Framing/ Rough-in | 12/2/1998 | 12/2/1998 | 12/2/1998 | | PART |
Dave Lightfoot
|
|
|
/ / 337 - partial r/i ok
|
INSP - Framing/ Rough-in | 12/1/1998 | 12/1/1998 | 12/2/1998 | P | FAIL |
Jim Storey
|
|
|
12/01/98 301 - trans to d lightfoot
|
INSP - Conference | 10/15/1998 | 10/15/1998 | 10/15/1998 | | PART |
Dave Lightfoot
|
|
|
/ / 337 - conference ok
|
INSP - Framing/ Rough-in | 9/14/1998 | 9/14/1998 | 9/14/1998 | | FAIL |
Dave Lightfoot
|
|
|
/ / 337 - part r/i
|
INSP - Framing/ Rough-in | 9/14/1998 | 9/14/1998 | 9/14/1998 | P | CANC |
Dave Lightfoot
|
|
|
09/14/98 337 - Scheduled by Hello!. Contact phone is [3429336]. all fire place gas lines have been removed
|
INSP - Framing/ Rough-in | 9/11/1998 | 9/11/1998 | 9/11/1998 | P | CANC |
Dave Lightfoot
|
|
|
09/11/98 337 - MICHELLE ###-#### cancel till mon
|