Final | 11/10/1999 | 11/12/1999 | 11/12/1999 | A | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 11/10/1999 at 11:33:22. Contact: ###-####.
|
Rough-in | 10/29/1999 | 10/29/1999 | 10/29/1999 | P | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 10/29/1999 at 07:54:49. Contact: ###-####. Lab room gas test
|
Rough-in | 9/22/1999 | 9/23/1999 | 9/23/1999 | | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 09/22/1999 at 14:40:46. Contact: ###-####.
|
Pressure Test | 9/13/1999 | 9/13/1999 | 9/13/1999 | P | PART |
Dave Lightfoot
|
|
|
60PSI TEST OK METER TO PENTHOUSE
|
INSP - Framing/ Rough-in | 8/25/1999 | 8/26/1999 | 8/26/1999 | P | PART |
Dave Lightfoot
|
|
|
08/26/99 337 - part gas and hydronics
|
INSP - Framing/ Rough-in | 7/21/1999 | 7/21/1999 | 7/21/1999 | P | PART |
Alan Hauser
|
|
|
07/21/99 350 - pt all 2nd flr,riser 1-4 flrs ok, 2"
|