INSP - Final | 5/26/1999 | 5/26/1999 | 5/26/1999 | P | PASS |
Dave Lightfoot
|
|
|
05/26/99 337 - removed convection sign occ card
|
INSP - Final | 5/26/1999 | 5/26/1999 | 5/26/1999 | P | PASS |
Dave Lightfoot
|
|
|
05/26/99 337 - removed convection sign occ card
|
INSP - Final | 5/19/1999 | 5/20/1999 | 5/20/1999 | A | FAIL |
Dave Lightfoot
|
|
|
05/20/99 337 - need oven clearance
|
INSP - Final | 5/19/1999 | 5/20/1999 | 5/20/1999 | A | FAIL |
Dave Lightfoot
|
|
|
05/20/99 337 - need oven clearance
|
INSP - Final | 5/20/1999 | 5/20/1999 | 5/20/1999 | | FAIL |
Dave Lightfoot
|
|
|
05/20/99 337 - need oven clearance
|
INSP - Final | 5/20/1999 | 5/20/1999 | 5/20/1999 | | FAIL |
Dave Lightfoot
|
|
|
05/20/99 337 - need oven clearance
|
INSP - Final | 5/14/1999 | 5/14/1999 | 5/14/1999 | P | FAIL |
Dave Lightfoot
|
|
|
05/14/99 337 - need make up air need oven instructions
|
INSP - Final | 5/14/1999 | 5/14/1999 | 5/14/1999 | P | FAIL |
Dave Lightfoot
|
|
|
05/14/99 337 - need make up air need oven instructions
|
INSP - Framing/ Rough-in | 5/10/1999 | 5/10/1999 | 5/10/1999 | | FAIL |
Dave Lightfoot
|
|
|
/ / 337 - THIS WAS A CONFERENCE FAIL
|
INSP - Framing/ Rough-in | 10/16/1998 | 10/16/1998 | 10/16/1998 | | FAIL |
Dave Lightfoot
|
|
|
10/16/98 337 - marty ###-#### ladder is inside back door CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Framing/ Rough-in | 10/14/1998 | 10/14/1998 | 10/14/1998 | P | PART |
Dave Lightfoot
|
|
|
10/14/98 337 - MARTY ###-#### OR ###-#### MARTY HAS THE KEY TO LET YOU I GP -OK GAS PIPING
|
INSP - Framing/ Rough-in | 10/2/1998 | 10/2/1998 | 10/2/1998 | | FAIL |
Jim Storey
|
|
|
10/02/98 301 - EDDIE ###-#### BACK DOOR IS USUALLY OPEN IF FRONT IS NOT trans to dave l.
|
INSP - Framing/ Rough-in | 10/1/1998 | 10/2/1998 | 10/2/1998 | A | FAIL |
Jim Storey
|
|
|
10/02/98 301 - EDDIE ###-#### BACK DOOR IS USUALLY OPEN IF FRONT IS NOT trans to dave l.
|
INSP - Framing/ Rough-in | 9/28/1998 | 9/28/1998 | 9/28/1998 | | NR |
Dave Lightfoot
|
|
|
/ / 337 - gas test only not ready
|
INSP - Framing/ Rough-in | 9/28/1998 | 9/28/1998 | 9/28/1998 | P | FAIL |
Jim Storey
|
|
|
09/28/98 301 - EDDIE ###-#### CELL # -CALL 1ST-GAS TEST INSP trans to d.lightfoot com job.
|
INSP - Framing/ Rough-in | 9/25/1998 | 9/25/1998 | 9/28/1998 | P | FAIL |
Jim Storey
|
|
|
09/25/98 301 - EDDIE ###-#### R/I P/T UGA -UNABLE TO GAIN ACCESS-LEFT NOTC
|
INSP - Framing/ Rough-in | 9/17/1998 | 9/18/1998 | 9/18/1998 | A | FAIL |
Dave Lightfoot
|
|
|
09/18/98 337 - EDDIE ###-#### KNOCK OR GO TO THE BACK OF THE COMPLEX fail need access
|