INSP - Final | 5/7/1999 | 5/7/1999 | 5/7/1999 | P | PASS |
Alan Hauser
|
|
|
05/07/99 350 - ###-#### CRAIG//FINAL
|
INSP - Final | 5/7/1999 | 5/7/1999 | 5/7/1999 | P | PASS |
Alan Hauser
|
|
|
05/07/99 350 - ###-#### CRAIG//FINAL
|
INSP - Framing/ Rough-in | 4/13/1999 | 4/14/1999 | 4/14/1999 | A | PASS |
Alan Hauser
|
|
|
04/14/99 350 - pt for whole system complete
|
INSP - Framing/ Rough-in | 4/13/1999 | 4/13/1999 | 4/13/1999 | P | CANC |
Dave Lightfoot
|
|
|
04/13/99 337 - alans area
|
INSP - Framing/ Rough-in | 4/2/1999 | 4/2/1999 | 4/2/1999 | P | PASS |
Dave Lightfoot
|
|
|
04/02/99 337 - gas test ok
|
INSP - Framing/ Rough-in | 3/22/1999 | 3/23/1999 | 3/23/1999 | A | CANC |
Dixie Fellows
|
|
|
PARTIAL P/T AT THIS TIME/###-#### COMMERCIAL....GAVE TO DAVE L
|
INSP - Framing/ Rough-in | 1/4/1999 | 1/5/1999 | 1/5/1999 | A | PASS |
Alan Hauser
|
|
|
01/05/99 350 - 60# test ok for mainlines
|