INSP - Framing/ Rough-in | 12/11/1998 | 12/14/1998 | 12/11/1998 | A | PART |
Alan Hauser
|
|
|
12/11/98 350 - pt ok, corrections on regulators
|
INSP - Final | 12/10/1998 | 12/11/1998 | 12/11/1998 | A | PART |
Alan Hauser
|
|
|
12/11/98 350 - pt ok, still corrections on regulator
|
INSP - Final | 12/10/1998 | 12/11/1998 | 12/11/1998 | A | PART |
Alan Hauser
|
|
|
12/11/98 350 - pt ok, still corrections on regulator
|
INSP - Final | 11/10/1998 | 11/12/1998 | 11/12/1998 | A | PASS |
Alan Hauser
|
|
|
11/12/98 350 - signed final occ
|
INSP - Final | 11/10/1998 | 11/12/1998 | 11/12/1998 | A | PASS |
Alan Hauser
|
|
|
11/12/98 350 - signed final occ
|
INSP - Framing/ Rough-in | 11/4/1998 | 11/6/1998 | 11/6/1998 | A | PART |
Alan Hauser
|
|
|
11/06/98 350 - WALK THROUGH INSPECTION ONLY, meet with contractor about
|
INSP - Conference | 10/23/1998 | 10/23/1998 | 10/23/1998 | | PASS |
Alan Hauser
|
|
|
/ / 350 - meet with gas co., about gas piping test.
|
INSP - Framing/ Rough-in | 10/21/1998 | 10/22/1998 | 10/22/1998 | A | PART |
Alan Hauser
|
|
|
10/21/98 350 - pt only, piping not approved until drawings received
|
INSP - Framing/ Rough-in | 10/12/1998 | 10/13/1998 | 10/13/1998 | A | FAIL |
Alan Hauser
|
|
|
10/13/98 350 - no approved mech. plans with approved set, left notice
|
INSP - Framing/ Rough-in | 10/6/1998 | 10/7/1998 | 10/7/1998 | A | CANC |
Tom Arcoraci
|
|
|
10/07/98 408 - SHAWNA ###-#### R/I ONLY ON THE LOWER LEVEL done by 350
|
INSP - Rough-in & Gas Pressure | 10/7/1998 | 10/7/1998 | 10/7/1998 | | FAIL |
Alan Hauser
|
|
|
/ / 350 - no one on site, left notice to meet me on site
|