INSP - Framing/ Rough-in | 10/20/1998 | 10/20/1998 | 10/20/1998 | P | CANC |
Dave Lightfoot
|
|
|
10/20/98 337 - clayne ###-#### gas test done on trhe 13th
|
INSP - Final | 10/13/1998 | 10/13/1998 | 10/13/1998 | P | PART |
|
|
|
CLAYNE ###-#### this is a p/t only made ok tag at meter area
|
INSP - Final | 10/13/1998 | 10/13/1998 | 10/13/1998 | P | PART |
|
|
|
CLAYNE ###-#### this is a p/t only made ok tag at meter area
|