INSP - Final | 12/17/1998 | 12/17/1998 | 12/17/1998 | P | PART |
Dave Lightfoot
|
|
|
12/17/98 337 - part final ok hot tub and fire place not ready
|
INSP - Final | 12/17/1998 | 12/17/1998 | 12/17/1998 | P | PART |
Dave Lightfoot
|
|
|
12/17/98 337 - part final ok hot tub and fire place not ready
|
INSP - Framing/ Rough-in | 11/30/1998 | 11/30/1998 | 11/30/1998 | P | PASS |
Dave Lightfoot
|
|
|
11/30/98 337 - as test ###-#### or ###-#### GP -OK GAS PIPING
|
INSP - Framing/ Rough-in | 11/24/1998 | 11/25/1998 | 11/25/1998 | P | CANC |
Dave Lightfoot
|
|
|
11/25/98 337 - called and canceled
|
INSP - Framing/ Rough-in | 11/23/1998 | 11/24/1998 | 11/24/1998 | A | FAIL |
Dave Lightfoot
|
|
|
11/24/98 337 - P/T ONLY AT THIS TIME/JEFF ###-#### CELL ###-#### GARAGE DOOR OPEN P/GAUGE IS AT FURNACE END OF GAS LINE CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|