INSP - Final | 1/22/1999 | 1/22/1999 | 1/22/1999 | P | PASS |
Carl Dependahl
|
|
|
01/22/99 340 - Scheduled by Hello!. Contact phone is [3426863].
|
INSP - Final | 1/22/1999 | 1/22/1999 | 1/22/1999 | P | PASS |
Carl Dependahl
|
|
|
01/22/99 340 - Scheduled by Hello!. Contact phone is [3426863].
|
INSP - Framing/ Rough-in | 1/6/1999 | 1/7/1999 | 1/7/1999 | A | PASS |
Wes Worcester
|
|
|
01/07/99 342 - HEIDE ###-#### REINSPECT PRESSURE
|
INSP - Framing/ Rough-in | 12/24/1998 | 12/24/1998 | 12/24/1998 | A | PART |
Dixie Fellows
|
|
|
R/I OK..PRESS FAIL
|
INSP - Framing/ Rough-in | 12/23/1998 | 12/24/1998 | 12/24/1998 | A | CANC |
Dave Lightfoot
|
|
|
12/24/98 337 - changed to 411
|
INSP - Framing/ Rough-in | 12/21/1998 | 12/21/1998 | 12/21/1998 | P | FAIL |
Wes Worcester
|
|
|
12/22/98 342 - gas test failed, fans not connected, sheetrock at hvacblo
|