INSP - Final | 3/2/1999 | 3/2/1999 | 3/3/1999 | P | PASS |
Wes Worcester
|
|
|
03/02/99 342 - ###-#### Adam
|
INSP - Final | 3/2/1999 | 3/2/1999 | 3/3/1999 | P | PASS |
Wes Worcester
|
|
|
03/02/99 342 - ###-#### Adam
|
INSP - Framing/ Rough-in | 12/22/1998 | 12/23/1998 | 12/23/1998 | A | PASS |
Wes Worcester
|
|
|
12/23/98 342 - ADAM ###-#### FRAMING INSP SCHEDULED FOR 8:30 TO 9:00
|
INSP - Framing/ Rough-in | 12/22/1998 | 12/22/1998 | 12/21/1998 | P | FAIL |
Wes Worcester
|
|
|
12/22/98 342 - stillneeded1" clearance tob vent
|
INSP - Framing/ Rough-in | 12/18/1998 | 12/21/1998 | 12/21/1998 | A | FAIL |
Wes Worcester
|
|
|
12/22/98 342 - CAN YOU DO THIS THE SAME TIME AS FRAMING?? ###-####
|