INSP - Final | 3/25/1999 | 3/26/1999 | 3/26/1999 | A | PASS |
Dixie Fellows
|
|
|
###-#### JOE//FINAL REINSPECTION ALREADY DONE ON THE 25TH
|
INSP - Final | 3/25/1999 | 3/26/1999 | 3/26/1999 | A | PASS |
Dixie Fellows
|
|
|
###-#### JOE//FINAL REINSPECTION ALREADY DONE ON THE 25TH
|
INSP - Final | 3/24/1999 | 3/25/1999 | 3/25/1999 | A | FAIL |
Dixie Fellows
|
|
|
key above front mat ###-#### NO DRYER VENT TERMINATION
|
INSP - Final | 3/25/1999 | 3/25/1999 | 3/25/1999 | P | PASS |
Dixie Fellows
|
|
|
FINAL OK
|
INSP - Final | 3/25/1999 | 3/25/1999 | 3/25/1999 | P | PASS |
Dixie Fellows
|
|
|
FINAL OK
|
INSP - Final | 3/24/1999 | 3/25/1999 | 3/25/1999 | A | FAIL |
Dixie Fellows
|
|
|
key above front mat ###-#### NO DRYER VENT TERMINATION
|
INSP - Framing/ Rough-in | 12/23/1998 | 12/24/1998 | 12/24/1998 | A | PASS |
Jim Sly
|
|
|
12/24/98 316 - OK
|
INSP - Framing/ Rough-in | 12/22/1998 | 12/22/1998 | 12/22/1998 | P | FAIL |
Dixie Fellows
|
|
|
Joe ###-####---CORRECTIONS
|