Final | 12/7/2000 | 12/7/2000 | 12/7/2000 | P | PASS |
Dixie Fellows
|
|
|
FN INSP-- MIKE ###-####
|
Final | 11/27/2000 | 11/28/2000 | 11/28/2000 | A | FAIL |
Alan Hauser
|
|
|
$42 reinspection 11/28/2000 12:27:29 PM
|
Final | 3/9/2000 | 3/10/2000 | 3/10/2000 | A | FAIL |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 03/09/2000 at 11:37:33. Contact: ###-####.
|
INSP - Framing/ Rough-in | 1/19/1999 | 1/20/1999 | 1/20/1999 | A | PASS |
Alan Hauser
|
|
|
01/20/99 350 -
|
INSP - Framing/ Rough-in | 1/20/1999 | 1/20/1999 | 1/20/1999 | P | PASS |
Alan Hauser
|
|
|
01/20/99 350 -
|
INSP - Framing/ Rough-in | 1/19/1999 | 1/19/1999 | 1/19/1999 | P | FAIL |
Jim Sly
|
|
|
01/19/99 316 - C/N...Need total BTU load and distance to calc gas pipe s
|
INSP - Framing/ Rough-in | 1/15/1999 | 1/15/1999 | 1/15/1999 | P | FAIL |
Alan Hauser
|
|
|
01/15/99 350 - no address on whole street
|