INSP - Final | 3/24/1999 | 3/26/1999 | 3/26/1999 | A | PASS |
Dixie Fellows
|
|
|
###-#### BECKY//FINAL
|
INSP - Final | 3/24/1999 | 3/26/1999 | 3/26/1999 | A | PASS |
Dixie Fellows
|
|
|
###-#### BECKY//FINAL
|
INSP - Final | 2/3/1999 | 2/4/1999 | 2/4/1999 | A | PASS |
Dixie Fellows
|
|
|
02/04/99 411 - this was a gas test and a/c......no furnace installed
|
INSP - Final | 2/3/1999 | 2/4/1999 | 2/4/1999 | A | PASS |
Dixie Fellows
|
|
|
02/04/99 411 - this was a gas test and a/c......no furnace installed
|
INSP - Final | 2/2/1999 | 2/3/1999 | 2/3/1999 | A | FAIL |
Dixie Fellows
|
|
|
02/03/99 411 - pressure test failed
|
INSP - Final | 2/2/1999 | 2/3/1999 | 2/3/1999 | A | FAIL |
Dixie Fellows
|
|
|
02/03/99 411 - pressure test failed
|