INSP - Framing/ Rough-in | 5/26/1999 | 5/26/1999 | 5/26/1999 | | PASS |
Russ Owen
|
|
|
/ / 407 - DRYER VENT TOO BE CORRECTED AT FINAL.
|
INSP - Final | 5/20/1999 | 5/21/1999 | 5/21/1999 | A | PASS |
Dave Lightfoot
|
|
|
05/21/99 337 - passed by rus
|
INSP - Final | 5/20/1999 | 5/21/1999 | 5/21/1999 | A | PASS |
Dave Lightfoot
|
|
|
05/21/99 337 - passed by rus
|
INSP - Final | 5/19/1999 | 5/20/1999 | 5/20/1999 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by Hello!. Contact phone is [3434445].
|
INSP - Final | 5/19/1999 | 5/20/1999 | 5/20/1999 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by Hello!. Contact phone is [3434445].
|
INSP - Final | 5/19/1999 | 5/19/1999 | 5/19/1999 | P | FAIL |
Russ Owen
|
|
|
05/19/99 407 - left correction.
|
INSP - Final | 5/18/1999 | 5/19/1999 | 5/19/1999 | A | FAIL |
Dave Lightfoot
|
|
|
05/19/99 337 - no address posted
|
INSP - Final | 5/18/1999 | 5/19/1999 | 5/19/1999 | A | FAIL |
Dave Lightfoot
|
|
|
05/19/99 337 - no address posted
|
INSP - Final | 5/19/1999 | 5/19/1999 | 5/19/1999 | P | FAIL |
Russ Owen
|
|
|
05/19/99 407 - left correction.
|
INSP - Final | 5/7/1999 | 5/7/1999 | 5/7/1999 | P | NH |
Russ Owen
|
|
|
05/07/99 407 - locked out.
|
INSP - Final | 5/7/1999 | 5/7/1999 | 5/7/1999 | P | NH |
Russ Owen
|
|
|
05/07/99 407 - locked out.
|
INSP - Final | 4/29/1999 | 4/29/1999 | 4/29/1999 | P | CANC |
Russ Owen
|
|
|
Scheduled by Hello!. Contact phone is [3434446]. Cancelled by Hello! (Last update by [HLO]). Contact: [3434445].
|
INSP - Final | 4/29/1999 | 4/29/1999 | 4/29/1999 | P | CANC |
Russ Owen
|
|
|
Scheduled by Hello!. Contact phone is [3434446]. Cancelled by Hello! (Last update by [HLO]). Contact: [3434445].
|
INSP - Framing/ Rough-in | 2/18/1999 | 2/18/1999 | 2/18/1999 | P | CANC |
Dixie Fellows
|
|
|
02/18/99 411 - DAVE DID THIS
|