Final | 10/5/1999 | 10/6/1999 | 10/6/1999 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 10/05/1999 at 16:43:51. Contact: ###-####. Done by 411
|
Final | 10/6/1999 | 10/6/1999 | 10/6/1999 | P | PASS |
Dixie Fellows
|
|
|
final ok
|
Final | 10/4/1999 | 10/5/1999 | 10/5/1999 | A | FAIL |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 10/04/1999 at 17:24:43. Contact: ###-####. Contractor will call Bob regarding correction notice by 350
|
Final | 10/1/1999 | 10/4/1999 | 10/4/1999 | A | FAIL |
Alan Hauser
|
|
|
558 CODE ###-#### TAMARRA corrections not done
|
Final | 9/30/1999 | 9/30/1999 | 9/30/1999 | P | FAIL |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 09/30/1999 at 09:39:46. Contact: ###-####.ACCESS CODE 5508 ON GAR DOOR Left C/N
|
INSP - Framing/ Rough-in | 2/26/1999 | 2/26/1999 | 2/26/1999 | | PASS |
Jim Sly
|
|
|
/ / 316 - TAG # 033147
|
INSP - Framing/ Rough-in | 2/25/1999 | 2/25/1999 | 2/25/1999 | P | CANC |
Jim Sly
|
|
|
###-#### Tauna jim sly did inspection today 2/26/99 lh
|
INSP - Framing/ Rough-in | 2/16/1999 | 2/16/1999 | 2/16/1999 | P | CANC |
Alan Hauser
|
|
|
67-7231 r/i gas test whos doing fireplace not ready per sub lh
|