INSP - Framing/ Rough-in | 3/10/1999 | 3/10/1999 | 3/10/2000 | | PASS |
Dixie Fellows
|
|
|
03/10/99 411 -
|
INSP - Final | 4/15/1999 | 4/16/1999 | 4/16/1999 | A | PASS |
Alan Hauser
|
|
|
04/16/99 350 -
|
INSP - Final | 4/15/1999 | 4/16/1999 | 4/16/1999 | A | PASS |
Alan Hauser
|
|
|
04/16/99 350 -
|
INSP - Final | 4/14/1999 | 4/15/1999 | 4/15/1999 | P | FAIL |
Alan Hauser
|
|
|
04/15/99 350 - need clearance at flue pipe
|
INSP - Final | 4/14/1999 | 4/15/1999 | 4/15/1999 | P | FAIL |
Alan Hauser
|
|
|
04/15/99 350 - need clearance at flue pipe
|
INSP - Final | 4/12/1999 | 4/13/1999 | 4/13/1999 | A | FAIL |
Alan Hauser
|
|
|
04/14/99 350 - FRED ###-####//FINAL
|
INSP - Final | 4/12/1999 | 4/13/1999 | 4/13/1999 | A | FAIL |
Alan Hauser
|
|
|
04/14/99 350 - FRED ###-####//FINAL
|
INSP - Final | 3/10/1999 | 3/10/1999 | 3/10/1999 | P | CANC |
Dixie Fellows
|
|
|
03/10/99 411 - ###-#### DEBBIE//REINSPECTION should have been a r/i
|
INSP - Final | 3/10/1999 | 3/10/1999 | 3/10/1999 | P | CANC |
Dixie Fellows
|
|
|
03/10/99 411 - ###-#### DEBBIE//REINSPECTION should have been a r/i
|
INSP - Framing/ Rough-in | 2/26/1999 | 2/26/1999 | 2/26/1999 | | FAIL |
|
|
|
02/26/99 338 - P/T MADE OK CN ON DUCTING AND PIPING
|