Final | 8/3/2000 | 8/4/2000 | 8/4/2000 | A | PASS |
Dixie Fellows
|
|
|
key is over the door stan ###-####
|
Final | 7/27/2000 | 7/28/2000 | 7/28/2000 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 07/27/2000 at 17:53:26. Contact: ###-####. put sealer on kit floor..no access 7/28/00 9:12:53 AM
|
Pressure Test | 10/14/1999 | 10/14/1999 | 10/14/1999 | P | PART |
Alan Hauser
|
|
|
###-#### N/R for final
|
Pressure Test | 10/8/1999 | 10/8/1999 | 10/8/1999 | P | FAIL |
Dixie Fellows
|
|
|
PRESURE TEST ONLY--- R & M BUILDERS-- ###-#### gas test failed not ready for final
|
Final | 10/7/1999 | 10/7/1999 | 10/7/1999 | P | FAIL |
Alan Hauser
|
|
|
john---cell ###-#### fn left c/n
|
INSP - Final | 4/5/1999 | 4/5/1999 | 4/5/1999 | P | FAIL |
Tom Arcoraci
|
|
|
04/05/99 408 - NOT READY FOR FINAL HEATING
|
INSP - Final | 4/5/1999 | 4/5/1999 | 4/5/1999 | P | FAIL |
Tom Arcoraci
|
|
|
04/05/99 408 - NOT READY FOR FINAL HEATING
|
INSP - Framing/ Rough-in | 3/31/1999 | 3/31/1999 | 3/31/1999 | P | PART |
Dixie Fellows
|
|
|
###-#### ted R/I OK...GAS TEST FAILED..CALLED CONTRACTOR
|
INSP - Framing/ Rough-in | 3/24/1999 | 3/24/1999 | 3/24/1999 | A | FAIL |
Dixie Fellows
|
|
|
CONFERENCE ON JOB WITH DAVE L. AND BUILDER
|
INSP - Framing/ Rough-in | 3/22/1999 | 3/23/1999 | 3/23/1999 | A | FAIL |
Dixie Fellows
|
|
|
###-#### ted or ###-####cell SUPPLY SUFFICIENT RETURN AIR....CALLED CONTRACTOR
|