Final | 3/8/2000 | 3/8/2000 | 3/8/2000 | P | FAIL |
Russ Owen
|
|
|
###-#### John or Marie ###-#### 1" clearance to b-vent. 3/9/00 2:13:53 PM
|
Final | 1/18/2000 | 1/19/2000 | 1/19/2000 | A | PART |
Alan Hauser
|
|
|
###-#### added B vent and closed floor register Wing #600 ok. 1/19/00 1:44:04 PM
|
Final | 10/13/1999 | 10/14/1999 | 10/14/1999 | A | FAIL |
Wes Worcester
|
|
|
john--- ###-#### pager ---re-insp fn Previous C/N not done- need 1st to B-vent from combustables
|
Final | 10/8/1999 | 10/11/1999 | 10/11/1999 | A | FAIL |
Dixie Fellows
|
|
|
John pager ###-#### vent lower combustion to outside- wire a/c disconnect 6" clearance from single wall to combustible
|
Pressure Test | 9/27/1999 | 9/28/1999 | 9/28/1999 | A | PASS |
Wes Worcester
|
|
|
###-####-PARAMONT HEATING PRE TEST
|
INSP - Framing/ Rough-in | 4/14/1999 | 4/14/1999 | 4/14/1999 | P | PASS |
Wes Worcester
|
|
|
04/14/99 342 - john-###-#### pres test--r/i furnace
|