Pressure Test | 11/9/1999 | 11/9/1999 | 11/9/1999 | P | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 11/09/1999 at 09:55:49. Contact: ###-####.
|
Rough-in | 11/9/1999 | 11/9/1999 | 11/9/1999 | P | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 11/09/1999 at 09:55:29. Contact: ###-####.
|
Rough-in | 11/8/1999 | 11/8/1999 | 11/8/1999 | P | FAIL |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 11/08/1999 at 10:25:30. Contact: ###-####. No contact.
|
INSP - Framing/ Rough-in | 7/29/1999 | 7/30/1999 | 7/30/1999 | A | CANC |
Russ Owen
|
|
|
07/30/99 407 - already done.
|
INSP - Framing/ Rough-in | 7/28/1999 | 7/29/1999 | 7/29/1999 | A | PASS |
Russ Owen
|
|
|
07/29/99 407 - BECKY REINSPECTION ON PRESSURE TEST ###-####
|
INSP - Framing/ Rough-in | 7/26/1999 | 7/26/1999 | 7/27/1999 | P | FAIL |
Alan Hauser
|
|
|
07/26/99 350 - pt failed, on zero
|
INSP - Framing/ Rough-in | 6/2/1999 | 6/2/1999 | 6/2/1999 | P | FAIL |
Dave Lightfoot
|
|
|
06/02/99 337 - not ready
|