Final | 12/23/1999 | 12/28/1999 | 12/28/1999 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 12/23/1999 at 11:19:31. Contact: ###-####.---GAS PRES TEST PASSED PER DIXIE. Gas ok.
|
Final | 12/22/1999 | 12/23/1999 | 12/23/1999 | A | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 12/22/1999 at 15:27:21. Contact: ###-####. 2 gas test ok; 1 gas test failed.
|
Final | 12/21/1999 | 12/22/1999 | 12/22/1999 | A | FAIL |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 12/21/1999 at 16:28:36. Contact: ###-####. 2 of 3 test failed, all require 60# test.
|
Final | 12/20/1999 | 12/21/1999 | 12/21/1999 | A | FAIL |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 12/20/1999 at 16:02:00. Contact: ###-####. No access.
|
INSP - Final | 7/26/1999 | 7/26/1999 | 7/27/1999 | P | PASS |
Alan Hauser
|
|
|
07/26/99 350 - mainline only, no equipment
|
INSP - Final | 7/26/1999 | 7/26/1999 | 7/27/1999 | P | PASS |
Alan Hauser
|
|
|
07/26/99 350 - mainline only, no equipment
|