Final | 2/25/2000 | 2/25/2000 | 2/25/2000 | P | PASS |
Dave Lightfoot
|
|
|
###-#### Sign occ. card 2/28/00 2:14:02 PM
|
Final | 2/9/2000 | 2/10/2000 | 2/10/2000 | A | PART |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 02/09/2000 at 14:10:35. Contact: ###-####. Ok to cover except stairwell and lobby.
|
Rough-in | 1/19/2000 | 1/19/2000 | 1/19/2000 | P | PASS |
Dave Lightfoot
|
|
|
###-####Tom R/I ok. 1/20/00 9:12:27 AM
|
Rough-in | 12/15/1999 | 12/15/1999 | 12/15/1999 | P | PART |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 12/15/1999 at 08:41:58. Contact: ###-####. Part. R/I ok.
|