Final | 9/22/1999 | 9/22/1999 | 9/22/1999 | P | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 09/22/1999 at 09:55:08. Contact: ###-####. Final ok- no occ. Card on site
|
INSP - Framing/ Rough-in | 8/30/1999 | 8/30/1999 | 8/30/1999 | P | PART |
Dave Lightfoot
|
|
|
08/30/99 337 - part gas test ok
|
INSP - Framing/ Rough-in | 8/27/1999 | 8/30/1999 | 8/30/1999 | A | FAIL |
Dave Lightfoot
|
|
|
08/30/99 337 - gas fail
|
INSP - Framing/ Rough-in | 8/26/1999 | 8/27/1999 | 8/27/1999 | A | FAIL |
Dave Lightfoot
|
|
|
08/27/99 337 - corrections
|
INSP - Framing/ Rough-in | 8/11/1999 | 8/12/1999 | 8/12/1999 | A | FAIL |
Dave Lightfoot
|
|
|
08/12/99 337 - AMANDA ###-#### P/T RESCHEDULED FROM WED. sent to wrong place
|
INSP - Framing/ Rough-in | 8/10/1999 | 8/11/1999 | 8/11/1999 | P | CANC |
Dave Lightfoot
|
|
|
08/11/99 337 - called and canceled
|
INSP - Framing/ Rough-in | 7/23/1999 | 7/26/1999 | 7/26/1999 | A | FAIL |
Alan Hauser
|
|
|
07/26/99 350 - need smoke detectors at all r.tu.
|