Final | 10/1/1999 | 10/1/1999 | 10/1/1999 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 10/01/1999 at 09:29:00. Contact: ###-####. Final ok
|
Final | 9/28/1999 | 9/29/1999 | 9/29/1999 | P | FAIL |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 09/28/1999 at 15:07:49. Contact: ###-####. Left C/N
|
INSP - Framing/ Rough-in | 7/27/1999 | 7/27/1999 | 7/27/1999 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by Hello!. Contact phone is [3434446]. R/I OK
|