Final | 9/15/1999 | 9/16/1999 | 9/16/1999 | A | PASS |
Dixie Fellows
|
|
|
FINAL OK
|
Final | 9/14/1999 | 9/15/1999 | 9/15/1999 | A | FAIL |
Alan Hauser
|
|
|
LEFT C/N
|
Final | 9/13/1999 | 9/14/1999 | 9/14/1999 | A | FAIL |
Dixie Fellows
|
|
|
NOT READY
|
INSP - Framing/ Rough-in | 7/19/1999 | 7/20/1999 | 7/20/1999 | A | PASS |
Dixie Fellows
|
|
|
RANDY ###-#### PRESSURE GAS FOR ADDED APPLIANCES OK
|
INSP - Framing/ Rough-in | 7/13/1999 | 7/14/1999 | 7/14/1999 | A | FAIL |
Dixie Fellows
|
|
|
RE TEST FOR GAS TEST RANDY ###-#### ADDED ADDITIONAL GAS APPLIANCE....PIPE NOW UNDERSIZED
|
INSP - Framing/ Rough-in | 6/30/1999 | 6/30/1999 | 6/30/1999 | P | FAIL |
Jim Sly
|
|
|
06/30/99 316 - Done by Dixie
|
INSP - Framing/ Rough-in | 6/30/1999 | 6/30/1999 | 6/30/1999 | P | PASS |
Dixie Fellows
|
|
|
OK
|
INSP - Framing/ Rough-in | 6/28/1999 | 6/29/1999 | 6/29/1999 | A | FAIL |
Jim Sly
|
|
|
06/29/99 316 - C/NPress test fail, support gas line, insulate cold air c
|