Final | 11/24/1999 | 11/24/1999 | 11/24/1999 | P | FAIL |
Dixie Fellows
|
|
|
as per dixxxxiiiieeee Done by 350.
|
Final | 11/23/1999 | 11/23/1999 | 11/23/1999 | P | FAIL |
Dixie Fellows
|
|
|
FOR ACCESS OPEN GAR DOOR-- CHARLIE ###-#### FN No address posted.
|
Final | 11/18/1999 | 11/19/1999 | 11/19/1999 | A | FAIL |
Alan Hauser
|
|
|
charlie ###-#### No access.
|
Final | 11/10/1999 | 11/12/1999 | 11/12/1999 | A | FAIL |
Jim Sly
|
|
|
charlie ###-#### reinspection C/N firecaulk, prot. Posts, dryer vent, seal A/C lines.
|
Final | 9/30/1999 | 10/1/1999 | 10/1/1999 | A | FAIL |
Dixie Fellows
|
|
|
Charlie ###-#### Not ready
|
INSP - Framing/ Rough-in | 7/16/1999 | 7/19/1999 | 7/19/1999 | A | FAIL |
Dixie Fellows
|
|
|
this is for the f/p charlie ###-####
|
INSP - Framing/ Rough-in | 7/12/1999 | 7/12/1999 | 7/13/1999 | P | PASS |
Tom Arcoraci
|
|
|
07/12/99 408 - charlie ###-#### r/i p/t
|
INSP - Framing/ Rough-in | 7/1/1999 | 7/1/1999 | 7/1/1900 | P | CANC |
Jim Sly
|
|
|
Val ###-#### val cancel
|