Final | 10/12/1999 | 10/13/1999 | 10/13/1999 | A | PASS |
Alan Hauser
|
|
|
SABRINA ###-#### --FN INSP
|
Final | 10/11/1999 | 10/12/1999 | 10/12/1999 | A | FAIL |
Alan Hauser
|
|
|
###-#### regulater installed wrong
|
Final | 10/11/1999 | 10/11/1999 | 10/11/1999 | P | FAIL |
Alan Hauser
|
|
|
###-#### need pressure test
|
Pressure Test | 10/11/1999 | 10/11/1999 | 10/11/1999 | P | FAIL |
Alan Hauser
|
|
|
###-#### $42.OO REINSPECTION FEE
|
Final | 9/30/1999 | 10/1/1999 | 10/1/1999 | A | FAIL |
Alan Hauser
|
|
|
Sabrina ###-#### Final and a pressure test PRES TEST FAILED
|
INSP - Framing/ Rough-in | 8/10/1999 | 8/11/1999 | 8/11/1999 | A | PART |
Alan Hauser
|
|
|
08/11/99 350 - SABRINA ###-#### DUCTWORK
|