DOC - Permit Finaled | | | 8/2/2001 | | DONE |
|
|
|
finaled per dave
|
Pressure Test | 5/17/2000 | 5/17/2000 | 5/17/2000 | P | PART |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 05/17/2000 at 09:32:52. Contact: ###-####. Pool bldg. roof top unit gas. 5/18/00 3:12:26 PM
|
Rough-in | 2/14/2000 | 2/15/2000 | 2/15/2000 | A | PART |
Dave Lightfoot
|
|
|
rooms 102,103,104,106, and 107 r/i victor ###-#### Partial hydronic inspection ok. 2/15/00 1:21:29 PM
|
Pressure Test | 2/4/2000 | 2/4/2000 | 2/4/2000 | P | PART |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 02/04/2000 at 10:49:20. Contact: ###-####. Gas test for RTU ok. 2/7/00 8:43:05 AM
|
Pressure Test | 11/5/1999 | 11/8/1999 | 11/8/1999 | A | PART |
Dave Lightfoot
|
|
|
VICTOR-- ###-#### PRE TEST Part. Gas test ok
|
INSP - Framing/ Rough-in | 7/22/1999 | 7/23/1999 | 7/23/1999 | A | PASS |
Alan Hauser
|
|
|
07/23/99 350 - victor ###-#### p/t,
|
INSP - Framing/ Rough-in | 7/14/1999 | 7/15/1999 | 7/15/1999 | A | PART |
Dave Lightfoot
|
|
|
07/15/99 337 - part gas test ok
|