Final | 2/7/2000 | 2/7/2000 | 2/7/2000 | P | PASS |
Jim Storey
|
|
|
###-#### back doors will be open
|
Conference | 2/2/2000 | 2/3/2000 | 2/3/2000 | A | FAIL |
Jim Storey
|
|
|
denton --###-#### conf---CALL 1ST BEFORE INSP
|
Final | 1/21/2000 | 1/24/2000 | 1/24/2000 | A | FAIL |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 01/21/2000 at 10:56:15. Contact: ###-####. Not ready. 1/25/00 1:14:29 PM
|
INSP - Final | 8/19/1999 | 8/20/1999 | 8/20/1999 | A | PART |
Dave Lightfoot
|
|
|
08/20/99 337 - rough in ok
|
INSP - Final | 8/19/1999 | 8/20/1999 | 8/20/1999 | A | PART |
Dave Lightfoot
|
|
|
08/20/99 337 - rough in ok
|
INSP - Final | 8/12/1999 | 8/12/1999 | 8/12/1999 | P | FAIL |
Dave Lightfoot
|
|
|
08/12/99 337 - corrections
|
INSP - Final | 8/12/1999 | 8/12/1999 | 8/12/1999 | P | FAIL |
Dave Lightfoot
|
|
|
08/12/99 337 - corrections
|
INSP - Framing/ Rough-in | 8/2/1999 | 8/3/1999 | 8/3/1999 | A | FAIL |
Dave Lightfoot
|
|
|
08/03/99 337 - corrections
|
INSP - Framing/ Rough-in | 7/28/1999 | 7/29/1999 | 7/29/1999 | A | PASS |
Jim Storey
|
|
|
07/29/99 301 - BECKY ###-#### REINSPECTION ON PRESSURE gas test only ok
|
INSP - Framing/ Rough-in | 7/26/1999 | 7/27/1999 | 7/27/1999 | A | FAIL |
Russ Owen
|
|
|
07/27/99 407 - one passed one failed.
|
INSP - Framing/ Rough-in | 7/21/1999 | 7/21/1999 | 7/21/1999 | | FAIL |
|
|
|
Pressure test fail, both lines.
|
INSP - Framing/ Rough-in | 7/20/1999 | 7/21/1999 | 7/21/1999 | A | FAIL |
Jim Storey
|
|
|
07/21/99 301 - trans to bob a.
|
INSP - Framing/ Rough-in | 7/19/1999 | 7/20/1999 | 7/20/1999 | A | FAIL |
Jim Storey
|
|
|
07/20/99 301 - ###-####
|