Final | 10/7/1999 | 10/8/1999 | 10/8/1999 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 10/07/1999 at 17:04:01. Contact: ###-####.
|
Final | 9/27/1999 | 9/28/1999 | 9/28/1999 | P | FAIL |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 09/27/1999 at 16:08:10. Contact: ###-####. Left C/N
|
INSP - Framing/ Rough-in | 7/27/1999 | 7/27/1999 | 7/27/1999 | P | PASS |
Dixie Fellows
|
|
|
ELLIOT ###-#### 12775 W. SILVERBROOK, ADDRESS IS IN THE WINDOW LOT 34 BLOCK 5 REINSPECTION. R/I PRESSURE TEST
|
INSP - Framing/ Rough-in | 7/26/1999 | 7/26/1999 | 7/26/1999 | P | FAIL |
Dixie Fellows
|
|
|
r/i p/t Brent ###-#### NO ADDRESS OR WORK BEING DONE
|