Rough-in | 4/4/2001 | 4/5/2001 | 4/5/2001 | P | CANC |
Alan Hauser
|
|
|
entered wrong permit number 4/5/2001 11:53:06 AM
|
Final | 10/28/1999 | 10/28/1999 | 10/28/1999 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/28/1999 at 09:45:45. Contact: ###-####.
|
Final | 10/26/1999 | 10/26/1999 | 10/26/1999 | P | FAIL |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 10/26/1999 at 08:43:54. Contact: ###-####. Left C/N
|
Final | 10/25/1999 | 10/25/1999 | 10/25/1999 | P | CANC |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/25/1999 at 09:09:00. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 10/25/1999 at 09:14:41.
|
INSP - Framing/ Rough-in | 8/2/1999 | 8/2/1999 | 8/2/1999 | | PASS |
|
|
|
|
INSP - Framing/ Rough-in | 7/30/1999 | 8/2/1999 | 8/2/1999 | A | FAIL |
Jim Sly
|
|
|
08/02/99 316 - Done by Alan H.
|
INSP - Framing/ Rough-in | 7/29/1999 | 7/30/1999 | 7/30/1999 | A | PASS |
Alan Hauser
|
|
|
07/30/99 350 - SAM ###-####
|