Final | 9/23/1999 | 9/23/1999 | 9/23/1999 | P | PASS |
Wes Worcester
|
|
|
|
Final | 9/17/1999 | 9/21/1999 | 9/21/1999 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 09/17/1999 at 08:16:48. Contact: ###-####. lock box # 7693
|
INSP - Framing/ Rough-in | 8/16/1999 | 8/17/1999 | 8/17/1999 | A | PASS |
Dixie Fellows
|
|
|
DAN ###-#### R/I -RE-INSP
|
INSP - Framing/ Rough-in | 8/16/1999 | 8/16/1999 | 8/16/1999 | P | FAIL |
Dixie Fellows
|
|
|
REINSPECTION DAN ###-####
|
INSP - Framing/ Rough-in | 8/13/1999 | 8/13/1999 | 8/13/1999 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by Hello!. Contact phone is [4591329].
|
INSP - Framing/ Rough-in | 8/5/1999 | 8/6/1999 | 8/6/1999 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by Hello!. Contact phone is [4591329]. SEAL R/A AND FRAME B-VENT AT 2ND FLOOR...INSTALL FIRE STOP AND CAULK IT
|