Final | 9/8/1999 | 9/9/1999 | 9/9/1999 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 09/08/1999 at 14:57:28. Contact: ###-####. 9/9 entered pass. jrb
|
INSP - Framing/ Rough-in | 8/3/1999 | 8/4/1999 | 8/4/1999 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by Hello!. Contact phone is [3362665]. CORRECTIONS MADE
|
INSP - Framing/ Rough-in | 8/2/1999 | 8/2/1999 | 8/2/1999 | P | FAIL |
Dixie Fellows
|
|
|
AMY ###-#### CORRECTIONS CALLED ANDY
|