Final | 5/16/2000 | 5/17/2000 | 5/17/2000 | P | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 05/16/2000 at 15:10:46. Contact: ###-####. Kitchen equipment gas piping ok. 5/18/00 3:12:38 PM
|
Final | 4/11/2000 | 4/11/2000 | 4/11/2000 | P | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 04/11/2000 at 10:02:00. Contact: ###-####.
|
Final | 3/13/2000 | 3/13/2000 | 3/13/2000 | P | PART |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 03/13/2000 at 09:57:00. Contact: . Signed temp. occ. 3/14/00 1:51:03 PM
|
Final | 3/10/2000 | 3/10/2000 | 3/10/2000 | P | PART |
Dave Lightfoot
|
|
|
charlie ###-#### S side 1st and 4th floors ok. 3/14/00 11:38:34 AM
|
Rough-in | 1/4/2000 | 1/5/2000 | 1/5/2000 | A | PART |
Dave Lightfoot
|
|
|
###-#### CHARLIE. Part. gas test ok.
|