Final | 10/28/1999 | 10/29/1999 | 10/29/1999 | A | PART |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 10/28/1999 at 13:43:11. Contact: ###-####. Sign temp. occ. Card
|
Final | 10/21/1999 | 10/22/1999 | 10/22/1999 | A | PART |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 10/21/1999 at 14:57:54. Contact: ###-####. Partial gas ok
|
Pressure Test | 10/1/1999 | 10/1/1999 | 10/1/1999 | P | FAIL |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 10/01/1999 at 10:27:47. Contact: ###-####. Gas not sized correct
|
Pressure Test | 9/21/1999 | 9/22/1999 | 9/22/1999 | A | FAIL |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 09/21/1999 at 13:45:57. Contact: ###-####. Not ready
|
Pressure Test | 9/9/1999 | 9/10/1999 | 9/10/1999 | A | FAIL |
Dave Lightfoot
|
|
|
gas pipe not complete
|
INSP - Framing/ Rough-in | 9/3/1999 | 7/7/1999 | 9/3/1999 | A | |
Dave Lightfoot
|
|
|
BRENT ###-####
|
INSP - Framing/ Rough-in | 8/3/1999 | 8/3/1999 | 8/3/1999 | P | FAIL |
Dave Lightfoot
|
|
|
08/03/99 337 - not ready
|