Final | 9/21/1999 | 9/22/1999 | 9/22/1999 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 09/21/1999 at 15:49:24. Contact: ###-####.
|
Final | 9/17/1999 | 9/20/1999 | 9/20/1999 | P | PART |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 09/17/1999 at 13:18:40. Contact: ###-####. Signed temp. left c/n
|
Final | 9/9/1999 | 9/9/1999 | 9/9/1999 | P | CANC |
Dave Lightfoot
|
|
|
insptr 340 (Carl) is doing inspectn
|
Rough-in | 9/9/1999 | 9/9/1999 | 9/9/1999 | P | PART |
Carl Dependahl
|
|
|
c/n ok exc. combustion air...check at final...interlocking louvers.
|
INSP - Framing/ Rough-in | 9/2/1999 | 9/3/1999 | 9/3/1999 | A | FAIL |
Alan Hauser
|
|
|
09/03/99 350 - corrections
|
INSP - Framing/ Rough-in | 8/11/1999 | 8/12/1999 | 8/12/1999 | A | PART |
Alan Hauser
|
|
|
08/12/99 350 - no grid, duct ok
|