Final | 11/1/1999 | 11/1/1999 | 11/1/1999 | P | PASS |
Alan Hauser
|
|
|
re-insp fn=-- ###-####--andrea
|
Final | 9/23/1999 | 9/23/1999 | 9/23/1999 | P | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 09/23/1999 at 08:31:03. Contact: ###-####. Not ready and 14414 locked
|
INSP - Framing/ Rough-in | 8/17/1999 | 8/18/1999 | 8/18/1999 | A | FAIL |
Dixie Fellows
|
|
|
dave cole ###-#### r/i & ser CALLED DAVE WITH CORRECTIONS
|
INSP - Framing/ Rough-in | 8/18/1999 | 8/18/1999 | 8/18/1999 | P | PASS |
Dixie Fellows
|
|
|
r/i reinspection ###-####
|