Final | 11/3/1999 | 11/4/1999 | 11/4/1999 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 11/03/1999 at 13:25:16. Contact: ###-####. Final ok.
|
INSP - Final | 8/20/1999 | 8/20/1999 | 8/20/1999 | P | PART |
Alan Hauser
|
|
|
08/20/99 350 - this is rough-in
|
INSP - Final | 8/20/1999 | 8/20/1999 | 8/20/1999 | P | PART |
Alan Hauser
|
|
|
08/20/99 350 - this is rough-in
|
INSP - Framing/ Rough-in | 8/19/1999 | 8/20/1999 | 8/20/1999 | A | PART |
Carl Dependahl
|
|
|
08/20/99 340 - ANDREA ###-#### FIRST THING IF POSSIBLE
|
INSP - Final | 8/19/1999 | 8/19/1999 | 8/19/1999 | P | CANC |
Dixie Fellows
|
|
|
###-#### UNABLE TO GET THERE AGAIN TODAY
|
INSP - Final | 8/19/1999 | 8/19/1999 | 8/19/1999 | P | CANC |
Dixie Fellows
|
|
|
###-#### UNABLE TO GET THERE AGAIN TODAY
|
INSP - Framing/ Rough-in | 8/18/1999 | 8/19/1999 | 8/19/1999 | A | FAIL |
Dixie Fellows
|
|
|
###-#### andrea--re-insp r/i & press wit test NOT READY AGAIN
|
INSP - Framing/ Rough-in | 8/18/1999 | 8/18/1999 | 8/18/1999 | P | FAIL |
Dixie Fellows
|
|
|
R/I, P/T ANDREA ###-#### NOT READY
|