Final | 10/27/1999 | 10/28/1999 | 10/28/1999 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/27/1999 at 17:03:29. Contact: ###-####.
|
Rough-in | 9/16/1999 | 9/17/1999 | 9/17/1999 | A | PASS |
Alan Hauser
|
|
|
|
Rough-in | 9/17/1999 | 9/17/1999 | 9/17/1999 | P | PART |
Alan Hauser
|
|
|
R/I OK, GAS PIPE FAILED
|
Rough-in | 9/16/1999 | 9/16/1999 | 9/16/1999 | P | FAIL |
Alan Hauser
|
|
|
NO ADDRESS POSTED
|