Final | 9/23/1999 | 9/24/1999 | 9/24/1999 | A | PASS |
Dave Lightfoot
|
|
|
CAPITOL HEATING ###-#### FN INSP
|
Final | 9/22/1999 | 9/22/1999 | 9/22/1999 | P | FAIL |
Dave Lightfoot
|
|
|
todd ###-#### corrections
|
INSP - Framing/ Rough-in | 8/18/1999 | 8/19/1999 | 8/19/1999 | A | PASS |
Dave Lightfoot
|
|
|
08/19/99 337 - pass
|