Final | 12/16/1999 | 12/16/1999 | 12/16/1999 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 12/16/1999 at 10:09:45. Contact: ###-####. Final ok.
|
Final | 12/15/1999 | 12/15/1999 | 12/15/1999 | P | FAIL |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 12/15/1999 at 08:19:41. Contact: ###-####. Left C/N.
|
Final | 12/3/1999 | 12/6/1999 | 12/3/1999 | A | CANC |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/03/1999 at 14:07:24. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 12/03/1999 at 14:12:10.
|
INSP - Framing/ Rough-in | 8/25/1999 | 8/26/1999 | 8/26/1999 | A | PASS |
Dixie Fellows
|
|
|
###-####
|