Final | 11/18/1999 | 11/19/1999 | 11/19/1999 | A | PASS |
Dixie Fellows
|
|
|
GLENN ###-#### FN-RE-INSP Final ok.
|
Final | 11/15/1999 | 11/16/1999 | 11/16/1999 | A | FAIL |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 11/15/1999 at 15:24:43. Contact: .
|
INSP - Framing/ Rough-in | 9/1/1999 | 9/1/1999 | 9/1/1999 | P | FAIL |
Russ Owen
|
|
|
09/01/99 407 - re-insp fee.
|