Final | 12/22/1999 | 12/22/1999 | 12/22/1999 | P | PASS |
Russ Owen
|
|
|
brandon ###-####
|
Final | 12/16/1999 | 12/16/1999 | 12/16/1999 | P | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 12/16/1999 at 08:19:24. Contact: ###-####. Prev. C/N not onsite- 407's area.
|
INSP - Framing/ Rough-in | 9/2/1999 | 9/3/1999 | 9/3/1999 | A | PART |
Russ Owen
|
|
|
09/03/99 407 - dryer vent to be corrected at final.
|
INSP - Framing/ Rough-in | 9/2/1999 | 9/2/1999 | 9/2/1999 | P | PART |
Russ Owen
|
|
|
gas test only other corrections .
|
INSP - Framing/ Rough-in | 8/30/1999 | 8/30/1999 | 8/30/1999 | P | FAIL |
Russ Owen
|
|
|
08/30/99 407 - left corrections.
|