Final | 10/29/1999 | 10/29/1999 | 10/29/1999 | P | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 10/29/1999 at 11:02:11. Contact: ###-####.
|
Final | 10/28/1999 | 10/28/1999 | 10/28/1999 | P | FAIL |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 10/28/1999 at 08:31:00. Contact: ###-####. Locked
|
Final | 10/22/1999 | 10/26/1999 | 10/26/1999 | A | FAIL |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 10/22/1999 at 15:03:41. Contact: ###-####. Left C/N
|
Final | 10/1/1999 | 10/4/1999 | 10/4/1999 | A | FAIL |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 10/01/1999 at 13:46:56. Contact: ###-####.//NO ACCESS
|
INSP - Framing/ Rough-in | 8/30/1999 | 8/31/1999 | 8/31/1999 | P | FAIL |
Dixie Fellows
|
|
|
LANCE ###-#### R/I P/T WRAP GAS PIPE & SEAL KITCHEN EXHAUST WITH FOIL TAOPE
|