Final | 9/29/1999 | 9/29/1999 | 9/29/1999 | A | PASS |
Dave Lightfoot
|
|
|
Final ok. sign occ. card
|
Final | 9/22/1999 | 9/23/1999 | 9/23/1999 | A | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 09/22/1999 at 08:58:05. Contact: ###-####. 1st floor T1 space
|
Rough-in | 9/9/1999 | 9/10/1999 | 9/10/1999 | A | PART |
Dave Lightfoot
|
|
|
part R/I ok
|