Final | 12/1/1999 | 12/2/1999 | 12/2/1999 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 12/01/1999 at 15:34:32. Contact: ###-####.
|
Rough-in | 9/8/1999 | 9/9/1999 | 9/9/1999 | A | PASS |
Dixie Fellows
|
|
|
|
Rough-in | 9/8/1999 | 9/8/1999 | 9/8/1999 | | PART |
Dixie Fellows
|
|
|
ANDREA-- ###-#### R/I & PRES TEST; 9/8 Gas ok, correction on drain pan-cld Dave. jrb;
|
INSP - Framing/ Rough-in | 9/3/1999 | 9/7/1999 | 9/7/1999 | A | FAIL |
Jim Sly
|
|
|
R/I, PRESURE. AMANDA ###-####; 9/7 C/N gas test fail, reads 14 lbs. jrb;
|
INSP - Framing/ Rough-in | 9/3/1999 | 9/3/1999 | 9/3/1999 | P | FAIL |
Dixie Fellows
|
|
|
andrea-- ###-#### re-insp r/i GAS STILL UNDERSIZE TO FURNACE
|