Final | 1/5/2000 | 1/6/2000 | 1/6/2000 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 01/05/2000 at 08:04:48. Contact: ###-####.
|
Final | 12/10/1999 | 12/13/1999 | 12/13/1999 | A | FAIL |
Jim Sly
|
|
|
###-#### C/N.. Move protection post.
|
Pressure Test | 9/8/1999 | 9/9/1999 | 9/9/1999 | A | PASS |
Tom Arcoraci
|
|
|
###-####; 9/9 entered pass. jrb
|
Rough-in | 9/8/1999 | 9/9/1999 | 9/9/1999 | A | PASS |
Tom Arcoraci
|
|
|
###-####; 9/9 entered pass. jrb
|