Final | 9/22/1999 | 9/23/1999 | 9/23/1999 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 09/22/1999 at 15:12:55. Contact: ###-####. Gas pipe test witness by gas company
|
Pressure Test | 9/17/1999 | 9/17/1999 | 9/17/1999 | P | FAIL |
Dave Lightfoot
|
|
|
Need to resize Gas pipe
|